The release of a chip for Bitcoin mining - 7nm BTC ASIC (IC, IP, TSMC lithography and prototype);
Release of co-processor for HPC acceleration ASIC+HBM2 (System in Package rototype - SiP);
Mass production of HPC co-processors and mining chips for 7nm BTC ASIC.
The results of the second stage: ASIC microcircuit for industrial mining 7nm BTC and a coprocessor to accelerate machine learning and robotic systems.
Additional emission
In the process of developing the project, Mineberg will have new capacities that will be reflected through the additional release of a batch of coins and placing them on the exchange. In total, after the implementation of three stages of additional emission, the total capacity of the immersion center will be 170 MW.
$10M - 25 Mineberg modules with a total capacity of 20 MW.
$20M - 50 Mineberg GreenHouse modules with a total capacity of 50 MW.
$35M - 80 Mineberg GreenHouse modules with a total capacity of 80 MW